fbpx
  • The VH900 is backed up by the industry’s best LIFETIME WARRANTY
  • 100% built in the USA
  • UPGRADE OPTION WITHOUT DEPRECIATION
  • Window wiper
  • American tech support Monday – Friday
  • Stainless steel cabinet
  • Heavy duty caster
  • Precision air regulator located on top left corner
VH900
  • 2x LED lighting for better visibility
  • Automated window rinse
  • Painted White
  • Automatic overflow valve
  • If you purchased a closed loop system, the basins will sit underneath the machine
  • Foot pedal operates the blasting gun for easy process and control
  • Aluminum front load door, very convenient
  • Small enough to fit through door ways
  • Rinse nozzle is standard
  • Heavy duty floor support

Equipment Specs

Internal Working Dimensions 36″ W x 24″ D x 30″ H
Power 110V Single Phase or 220V
Abrasive Amount 34 lbs.
Water Amount 24 Gallons
Pump High Volume Slurry Pump
Nozzles Standard Rinse Nozzle
CFM 20-30 CFM
PSI 80-90 PSI
Assembly No Assembly Required

Optional Features

Automated Tumble Basket

22″ Turntable

HD Caster Kit

220V Single phase

Immersion Heater (220V)

Rubber lined wall to keep paints cleaner

Frequently Asked Questions

  1. What’s the regular maintenance on vapor blasters as a whole?
  2. How often do I change media and water?
  3. Can I mix in something to stop freezing in the winter if I don’t have the unit in a place with heater?
  4. What abrasive can I run in the vapor hone?
  5. Does vapor honing take a lot of CFM?
  1. Really just changing the water and abrasive that’s it. Consumables will last much longer in the wet systems due to the cushioning effect.
  2. If you use it every other day I would change every month. If its occasional use you might go 2-3 months.
  3. One of the most frequent questions that I don’t have a good solution for other than draining the machine if you know it will be sitting for more than a week in the cold weather. I personally try to minimize mixing any thing other than water and abrasive because it can create bad finishes if it throws out the PH of the slurry.
  4. Any abrasive that you run in a dry blasting cabinet will run in a vapor honing machine.
  5. It depends on what you define as a lot any wet cabinet need 15-45 CFM to operate just depends on what machine model you choose.
If you like to see other machines in action or our before and after results, please visit our YouTube channel and subscribe
Click here 
lifetime warranty
design in USA
SiteLock